Title: Vibration problem solution of high-capacity hydropower units
Authors: Khalyasmaa, A. I.
Sultonov, S. M.
Ahyoev, J. S.
Bahovadinov, A. H.
Issue Date: 2020
Publisher: Institute of Physics Publishing
Citation: Khalyasmaa A. I. Vibration problem solution of high-capacity hydropower units / A. I. Khalyasmaa, S. M. Sultonov, J. S. Ahyoev, A. H. Bahovadinov. — DOI 10.1088/1757-899X/836/1/012009 // IOP Conference Series: Materials Science and Engineering. — 2020. — Vol. 1. — Iss. 836. — 12009.
Abstract: This paper proposes hydro generator vibration observations under various conditions and solution of a problem of high vibration in upper guide bearing of 110MW hydro generator. Among the test, which were carried out to identify vibration origin of hydro generating unit were: Voltage drop tests, magnetic flux measurements, interferric gap measurements, turbine pressure pulsation measurements, etc. It was shown, that among other possible reasons, correct balancing, including pivot bearing adjustment was the most efficient measure to eliminate vibration in start-up modes of hydro power unit. According to the results of conducted step-by-step defect analysis, the corresponding recommendations were provided for service and maintenance regarding the generation unit No2 of Sangtuda-2 Hydro Power Plant, Tajikistan. © Published under licence by IOP Publishing Ltd.
URI: http://elar.urfu.ru/handle/10995/92379
Access: info:eu-repo/semantics/openAccess
SCOPUS ID: 85085750192
WOS ID: 000562928800009
PURE ID: 13148701
ISSN: 17578981
DOI: 10.1088/1757-899X/836/1/012009
Appears in Collections:Научные публикации ученых УрФУ, проиндексированные в SCOPUS и WoS CC

Files in This Item:
File Description SizeFormat 
10.1088-1757-899X-836-1-012009.pdf802,75 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.