Please use this identifier to cite or link to this item:
http://elar.urfu.ru/handle/10995/27490
Title: | The experience of implementing and using the Windchill product lifecycle management system at the energy machine building enterprise |
Authors: | Kultyshev, A. Y. Blagodarev, A. A. Gladkii, A. V. Shanturov, D. N. |
Issue Date: | 2013 |
Citation: | The experience of implementing and using the Windchill product lifecycle management system at the energy machine building enterprise / A. Y. Kultyshev, A. A. Blagodarev, A. V. Gladkii [et al.] // Thermal Engineering. — 2013. — Vol. 60. — № 8. — P. 559-566. |
Abstract: | The experience of developing, implementing, and adapting the Windchill v.10 product lifecycle management (PLM) system intended for the automation of the control processes by the engineering data for the entire lifecycle of the hardware at the ZAO Ural Turbine Works (UTW) is described. © 2013 Pleiades Publishing, Ltd. |
Keywords: | DESIGN AND MANUFACTURING PRODUCTION PREPARATION DESIGN AND MANUFACTURING REPRESENTATION OF THE HARDWARE'S STRUCTURE PLM SYSTEM STEAM-TURBINE INSTALLATION CONTROL PROCESS ENGINEERING DATA ENTIRE LIFE CYCLES MACHINE BUILDING ENTERPRISE PLM SYSTEMS PRODUCT LIFECYCLE MANAGEMENT SYSTEMS PRODUCTION PREPARATION HARDWARE LIFE CYCLE MANUFACTURE STEAM TURBINES TURBINES INFORMATION MANAGEMENT |
URI: | http://elar.urfu.ru/handle/10995/27490 |
SCOPUS ID: | 84881180407 |
PURE ID: | 880353 |
ISSN: | 0040-6015 |
DOI: | 10.1134/S0040601513080065 |
Appears in Collections: | Научные публикации ученых УрФУ, проиндексированные в SCOPUS и WoS CC |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
scopus-2013-0636.pdf | 549,43 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.