Пожалуйста, используйте этот идентификатор, чтобы цитировать или ссылаться на этот ресурс: http://elar.urfu.ru/handle/10995/94266
Полная запись метаданных
Поле DCЗначениеЯзык
dc.contributor.authorPytalev, I. A.en
dc.contributor.authorDomozhirov, D. V.en
dc.contributor.authorUgolnikov, N. V.en
dc.contributor.authorProchorov, A. A.en
dc.date.accessioned2020-12-18T06:31:53Z-
dc.date.available2020-12-18T06:31:53Z-
dc.date.issued2020-
dc.identifier.citationApplication of hydrohammers of heavy class in the development of marble deposits in mining operations / I. A. Pytalev, D. V. Domozhirov, N. V. Ugolnikov, A. A. Prochorov. — DOI 10.1088/1757-899X/966/1/012020 // IOP Conference Series: Materials Science and Engineering . — 2020. — Vol. 966. — 12020.en
dc.identifier.issn1757-8981-
dc.identifier.otherhttp://www.scopus.com/inward/record.url?partnerID=8YFLogxK&scp=85097087697m
dc.identifier.urihttp://elar.urfu.ru/handle/10995/94266-
dc.description.abstractBy development marble deposits in mining operations one of the main technological processes, that ensures minimal losses and dilution with maximum output of commercial products is the process of preparing rocks for excavation. Marble extracted for the production of microcalcite is prepared for excavation by drilling and blasting at most mining enterprises. This inevitably leads to overgrinding in the charging chamber zone and, as a result, to a decreasing in quality indicators (yellowness and whiteness), significant losses of minerals (0-20 mm fraction) up to 30% and a low percentage of high-grade crushed stone in the commodity balance. The paper considers a variant of improving the production technology on the example of the Eleninsky marble Deposit (Chelyabinsk region) by using of heavy-class hydrohammers, which allows to increase the efficiency and completeness of the development of balance reserves by reducing by 5-10% overgrinding and increasing output of a commercial product high grades (40-200 mm). © Published under licence by IOP Publishing Ltd.en
dc.format.mimetypeapplication/pdfen
dc.language.isoenen
dc.publisherIOP Publishing Ltden
dc.relation.ispartof15th International Conference on Industrial Manufacturing and Metallurgy, ICIMM 2020en
dc.rightsinfo:eu-repo/semantics/openAccessen
dc.sourceIOP Conference Series: Materials Science and Engineeringen
dc.titleApplication of hydrohammers of heavy class in the development of marble deposits in mining operationsen
dc.typeConference Paperen
dc.typeinfo:eu-repo/semantics/publishedVersionen
dc.typeinfo:eu-repo/semantics/conferenceObjecten
dc.conference.name15th International Conference on Industrial Manufacturing and Metallurgy, ICIMM 2020en
dc.conference.date18.06.2020-19.06.2020-
dc.identifier.rsi85097087697
dc.identifier.doi10.1088/1757-899X/966/1/012020-
local.volume966-
local.description.order12020-
local.identifier.eid2-s2.0-85097087697-
Располагается в коллекциях:Междисциплинарные конференции, семинары, сборники

Файлы этого ресурса:
Файл Описание РазмерФормат 
966_1_012020.pdf492,77 kBAdobe PDFПросмотреть/Открыть


Все ресурсы в архиве электронных ресурсов защищены авторским правом, все права сохранены.