Пожалуйста, используйте этот идентификатор, чтобы цитировать или ссылаться на этот ресурс:
http://elar.urfu.ru/handle/10995/130546
Полная запись метаданных
Поле DC | Значение | Язык |
---|---|---|
dc.contributor.author | Bramm, A. M. | en |
dc.contributor.author | Eroshenko, S. A. | en |
dc.contributor.author | Khalyasmaa, A. I. | en |
dc.contributor.author | Matrenin, P. V. | en |
dc.date.accessioned | 2024-04-05T16:25:36Z | - |
dc.date.available | 2024-04-05T16:25:36Z | - |
dc.date.issued | 2023 | - |
dc.identifier.citation | Bramm, AM, Eroshenko, SA, Khalyasmaa, AI & Matrenin, PV 2023, 'Grey Wolf Optimizer for RES Capacity Factor Maximization at the Placement Planning Stage', Mathematics, Том. 11, № 11, 2545. https://doi.org/10.3390/math11112545 | harvard_pure |
dc.identifier.citation | Bramm, A. M., Eroshenko, S. A., Khalyasmaa, A. I., & Matrenin, P. V. (2023). Grey Wolf Optimizer for RES Capacity Factor Maximization at the Placement Planning Stage. Mathematics, 11(11), [2545]. https://doi.org/10.3390/math11112545 | apa_pure |
dc.identifier.issn | 2227-7390 | - |
dc.identifier.other | Final | 2 |
dc.identifier.other | All Open Access, Gold | 3 |
dc.identifier.other | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85161291926&doi=10.3390%2fmath11112545&partnerID=40&md5=16ec9e7e6100ec4a4bb352a07b0b5566 | 1 |
dc.identifier.other | https://www.mdpi.com/2227-7390/11/11/2545/pdf?version=1685610137 | |
dc.identifier.uri | http://elar.urfu.ru/handle/10995/130546 | - |
dc.description.abstract | At the current stage of the integration of renewable energy sources into the power systems of many countries, requirements for compliance with established technical characteristics are being applied to power generation. One such requirement is the installed capacity utilization factor, which is extremely important for optimally placing power facilities based on renewable energy sources and for the successful development of renewable energy. Efficient placement maximizes the installed capacity utilization factor of a power facility, increasing energy efficiency and the payback period. The installed capacity utilization factor depends on the assumed meteorological factors relating to geographical location and the technical characteristics of power generation. However, the installed capacity utilization factor cannot be accurately predicted, since it is necessary to know the volume of electricity produced by the power facility. A novel approach to the optimization of placement of renewable energy source power plants and their capacity factor forecasting was proposed in this article. This approach combines a machine learning forecasting algorithm (random forest regressor) with a metaheuristic optimization algorithm (grey wolf optimizer). Although the proposed approach assumes the use of only open-source data, the simulations show better results than commonly used algorithms, such as random search, particle swarm optimizer, and firefly algorithm. © 2023 by the authors. | en |
dc.description.sponsorship | Ministry of Education and Science of the Russian Federation, Minobrnauka: FEUZ-2022-0030 | en |
dc.description.sponsorship | The research was carried out within the state assignment with the financial support of the Ministry of Science and Higher Education of the Russian Federation (subject No. FEUZ-2022-0030 Development of an intelligent multi-agent system for modeling deeply integrated technological systems in the power industry). | en |
dc.format.mimetype | application/pdf | en |
dc.language.iso | en | en |
dc.publisher | MDPI | en |
dc.rights | info:eu-repo/semantics/openAccess | en |
dc.rights | cc-by | other |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | unpaywall |
dc.source | Mathematics | 2 |
dc.source | Mathematics | en |
dc.subject | CAPACITY FACTOR | en |
dc.subject | ENERGY OPTIMIZATION | en |
dc.subject | FORECASTING | en |
dc.subject | GREY WOLF OPTIMIZER | en |
dc.subject | OPTIMIZATION | en |
dc.subject | RENEWABLE ENERGY SOURCES | en |
dc.title | Grey Wolf Optimizer for RES Capacity Factor Maximization at the Placement Planning Stage | en |
dc.type | Article | en |
dc.type | info:eu-repo/semantics/article | en |
dc.type | |info:eu-repo/semantics/publishedVersion | en |
dc.identifier.doi | 10.3390/math11112545 | - |
dc.identifier.scopus | 85161291926 | - |
local.contributor.employee | Bramm, A.M., Ural Power Engineering Institute, Ural Federal University Named after the First President of Russia B.N. Yeltsin, Ekaterinburg, 620002, Russian Federation | en |
local.contributor.employee | Eroshenko, S.A., Ural Power Engineering Institute, Ural Federal University Named after the First President of Russia B.N. Yeltsin, Ekaterinburg, 620002, Russian Federation | en |
local.contributor.employee | Khalyasmaa, A.I., Ural Power Engineering Institute, Ural Federal University Named after the First President of Russia B.N. Yeltsin, Ekaterinburg, 620002, Russian Federation | en |
local.contributor.employee | Matrenin, P.V., Ural Power Engineering Institute, Ural Federal University Named after the First President of Russia B.N. Yeltsin, Ekaterinburg, 620002, Russian Federation | en |
local.issue | 11 | - |
local.volume | 11 | - |
dc.identifier.wos | 001003680800001 | - |
local.contributor.department | Ural Power Engineering Institute, Ural Federal University Named after the First President of Russia B.N. Yeltsin, Ekaterinburg, 620002, Russian Federation | en |
local.identifier.pure | 40642172 | - |
local.description.order | 2545 | - |
local.identifier.eid | 2-s2.0-85161291926 | - |
local.identifier.wos | WOS:001003680800001 | - |
Располагается в коллекциях: | Научные публикации ученых УрФУ, проиндексированные в SCOPUS и WoS CC |
Файлы этого ресурса:
Файл | Описание | Размер | Формат | |
---|---|---|---|---|
2-s2.0-85161291926.pdf | 5,93 MB | Adobe PDF | Просмотреть/Открыть |
Лицензия на ресурс: Лицензия Creative Commons