Пожалуйста, используйте этот идентификатор, чтобы цитировать или ссылаться на этот ресурс:
http://elar.urfu.ru/handle/10995/102522
Полная запись метаданных
Поле DC | Значение | Язык |
---|---|---|
dc.contributor.author | Matalasov, S. Y. | en |
dc.contributor.author | Kuznetsova, E. Y. | en |
dc.contributor.author | Podoliak, O. O. | en |
dc.date.accessioned | 2021-08-31T15:03:58Z | - |
dc.date.available | 2021-08-31T15:03:58Z | - |
dc.date.issued | 2020 | - |
dc.identifier.citation | Matalasov S. Y. Improvement of the workers labour rationing and motivation methodology for the manufacturing shop / S. Y. Matalasov, E. Y. Kuznetsova, O. O. Podoliak. — DOI 10.1088/1757-899X/971/5/052024 // IOP Conference Series: Materials Science and Engineering. — 2020. — Vol. 971. — Iss. 5. — 052024. | en |
dc.identifier.issn | 17578981 | - |
dc.identifier.other | Final | 2 |
dc.identifier.other | All Open Access, Gold | 3 |
dc.identifier.other | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85098070042&doi=10.1088%2f1757-899X%2f971%2f5%2f052024&partnerID=40&md5=dbc6deebfd826c8f9cf75770161b2f0b | |
dc.identifier.uri | http://elar.urfu.ru/handle/10995/102522 | - |
dc.description.abstract | The hypothesis considered in the work is that it is possible to normalize all works carried out at the production site and to use these norms to build a successful system of remuneration and motivation of personnel. To prove this hypothesis, the most complex and responsible in margin terms load section of the production plant was chosen. The work analyzed the causes of downtime and their impact on the productivity of workers and on the level of remuneration. The method of determining the worker's earnings depending on the unit of indicators and parameters is proposed. © Published under licence by IOP Publishing Ltd. | en |
dc.format.mimetype | application/pdf | en |
dc.language.iso | en | en |
dc.publisher | IOP Publishing Ltd | en |
dc.rights | info:eu-repo/semantics/openAccess | en |
dc.source | IOP Conf. Ser. Mater. Sci. Eng. | 2 |
dc.source | IOP Conference Series: Materials Science and Engineering | en |
dc.title | Improvement of the workers labour rationing and motivation methodology for the manufacturing shop | en |
dc.type | Conference Paper | en |
dc.type | info:eu-repo/semantics/conferenceObject | en |
dc.type | info:eu-repo/semantics/publishedVersion | en |
dc.identifier.doi | 10.1088/1757-899X/971/5/052024 | - |
dc.identifier.scopus | 85098070042 | - |
local.contributor.employee | Matalasov, S.Y., Institute of New Materials and Technologies, Ural Federal University Named after the First President of Russia B.N. Yeltsin, 19 Mira street, Ekaterinburg, 620002, Russian Federation | |
local.contributor.employee | Kuznetsova, E.Y., Institute of New Materials and Technologies, Ural Federal University Named after the First President of Russia B.N. Yeltsin, 19 Mira street, Ekaterinburg, 620002, Russian Federation | |
local.contributor.employee | Podoliak, O.O., Institute of New Materials and Technologies, Ural Federal University Named after the First President of Russia B.N. Yeltsin, 19 Mira street, Ekaterinburg, 620002, Russian Federation | |
local.issue | 5 | - |
local.volume | 971 | - |
dc.identifier.wos | 000646359100327 | - |
local.contributor.department | Institute of New Materials and Technologies, Ural Federal University Named after the First President of Russia B.N. Yeltsin, 19 Mira street, Ekaterinburg, 620002, Russian Federation | |
local.identifier.pure | b5d3fd59-10d5-423a-b5b3-271c0b320882 | uuid |
local.identifier.pure | 20412321 | - |
local.description.order | 052024 | - |
local.identifier.eid | 2-s2.0-85098070042 | - |
local.identifier.wos | WOS:000646359100327 | - |
Располагается в коллекциях: | Научные публикации ученых УрФУ, проиндексированные в SCOPUS и WoS CC |
Файлы этого ресурса:
Файл | Описание | Размер | Формат | |
---|---|---|---|---|
2-s2.0-85098070042.pdf | 461,96 kB | Adobe PDF | Просмотреть/Открыть |
Все ресурсы в архиве электронных ресурсов защищены авторским правом, все права сохранены.